ok, serious question for the one using the calculator the most.
i'm nearly completed nalili quest
the section is built with the repetable lesson at the start [both in the html and in the actual calculation]
after that the action you can take around the OE [with a system like wynn quest, keeping the exact order of doing that]
and then the four big project [both in the html and in the actual calculation]
i was thinking to put a restrain to the numeric input for stopping the ability to increase them after reaching 100 days.
this will preclude the ability to increase of one point if it's will make cross a threshold for the last 4 project. (you increase of one day, but reduce of 2 days the latter project)
in this case you need to remove one option selected, increase the numeric value and then reselect the option
{like one of the 4 big project}
in this exact example you can pile 2 more knowledge training to reach nalili knowledge 40. it's will reduce the duration of three big project by 1 day eaach
+2 -3 = -1
you actually gain a day.
without constrain you can simply increase by two.
in the other case you need deselect an option taking 2+ days to do
in discord Cylothar had made this suggestion
For ease of use and editing while trying to work out a route, rather than forcing a deselection like the rest of the calculator does, could you not have a very large and prominent warning if more than 100 days are being used? Like large red text: "More than 100 days plotted, this is not a valid route" Or something like that